China Beverage Machinery
LanguageEnglish
Product range
Beverage Machinery Products
Browse complete beverage production lines and supporting equipment. These pages explain how each machine fits into a real buyer project.

Select a Buyer Path
Every page includes buyer questions, equipment scope and links to the next step.
Water line
Bottled Water Production Line
Plan a complete PET bottled water line from water treatment and bottle blowing through filling, labeling and packing.
Common applications: purified water, mineral water, drinking water
Hot fill
Juice & Tea Filling Line
Review preparation, sterilization, hot fill or warm fill, cooling, CIP and packing for non-carbonated beverages.
Common applications: juice, tea, functional drinks
CSD line
Carbonated Drink Filling Line
Coordinate CO2 mixing, chilling, isobaric filling, bottle or can options and downstream packing.
Common applications: soda, sparkling water, CSD
Reusable bottle
5 Gallon Water Filling Line
Build a reusable 3-5 gallon water plant with washing, filling, capping, inspection and bagging sections.
Common applications: 3 gallon, 5 gallon and 19L bottles
Treatment
Water Treatment System
Match filtration, RO, UV, ozone and storage configuration with raw water quality and production capacity.
Common applications: drinking water and process water
Bottle supply
PET Bottle Blowing Machine
Balance bottle blowing capacity, preform neck, mould quantity, air compressor and air conveyor with filling speed.
Common applications: PET water, juice and carbonated bottles
Downstream
Labeling & Packing Equipment
Compare sleeve, OPP, self-adhesive labeling, coding and packing modules for beverage lines.
Common applications: labeling, coding, shrink packing
Project scope
Turnkey Beverage Production Line
Plan equipment list, factory layout questions, utility review, export packing and installation communication.
Common applications: new plants and line expansion
Prepare Your Beverage Line Quotation
Send your product type, container size, target capacity, destination country and required equipment scope. We will help prepare a practical configuration and quotation discussion.
Buyer Planning Resources
Plan Capacity, Layout and Supplier Comparison Before Ordering
Bottling Line Capacity Guide
Match BPH target, container size, shifts, packing speed and utility supply.
Factory Layout and Utility Guide
Prepare factory dimensions, power, air, water treatment, drainage and installation access.
Supplier Selection Checklist
Compare complete line scope, engineering support, export preparation and spare-parts planning.
Installation and Commissioning Timeline
Plan shipment, site readiness, test materials, operator training and acceptance.
Processing and line-integration equipment
Build the scope between raw ingredients and finished packs. These pages cover equipment that buyers often miss when comparing only the filler.
3-in-1 Bottle Filling Machine
Select a 3-in-1 bottle filling machine by beverage, bottle, cap, filling method, sanitation, capacity and downstream line requirements.
Open planning page
Beverage Processing System for Complete Filling Lines
Plan a beverage processing system covering water treatment, ingredient handling, mixing, thermal process, hygienic transfer, CIP and filler supply.
Open planning page
Juice Processing Line
Plan a juice processing line around ingredients, blending, filtration, deaeration, homogenization, thermal treatment, hot filling, cooling and CIP.
Open planning page
Beverage Syrup Room and Mixing System Planning
Plan a beverage syrup room for sugar dissolving, filtration, ingredient dosing, final blending, storage, hygienic transfer, recipe control and CIP.
Open planning page
Beverage Pasteurizer and Bottle Cooling Tunnel Selection
Select a beverage tunnel pasteurizer or bottle cooling tunnel from product process, container, temperature profile, residence time, utilities and line speed.
Open planning page
Carbonated Beverage Processing System
Plan carbonated beverage processing from treated water and syrup through blending, deaeration, chilling, carbonation, pressure transfer and counter-pressure filling.
Open planning page
Bottle Conveyor and Accumulation System for Filling Lines
Plan bottle conveyors and accumulation for stable transfers, machine decoupling, pressure control, changeovers, pack handling, line balance and operator access.
Open planning page
Continue the technical comparison
Use the most relevant planning and service pages instead of treating each machine as an isolated purchase.
Find the line by beverage, package or process
These specialized pages help buyers move from a broad equipment search to a clear product, package, hygiene and factory-stage scope.
Water and enhanced water
Juice, tea and functional drinks
sports drink isotonic beverage linefunctional beverage production linecoconut water filling linenfc juice processing filling linepulp juice beverage production lineready to drink tea production line
Sensitive and alternative beverages
ready to drink coffee production lineplant based beverage production linedairy beverage filling linekombucha bottling linebeer bottling canning line
CSD by package
Energy Drink Production Lineglass bottle carbonated drink linepet carbonated drink linecan carbonated drink line
Filling technology
hot fill pet bottle lineultra clean beverage filling lineaseptic beverage filling line
Factory stage and operating model
returnable glass bottle linesmall beverage factory startup linebeverage line retrofit expansionbeverage contract packing line
Plan by capacity, package, equipment module or project decision
Use the closest buyer-intent page to prepare product, package, capacity, factory and acceptance inputs before requesting a complete beverage line quotation.
Capacity-specific line planning
3,000 BPH Water Bottling Line8,000 BPH Water Bottling Line12,000 BPH Water Bottling Line18,000 BPH Water Bottling Line24,000 BPH Water Bottling Line2,000 BPH Juice and Tea Filling Line10,000 BPH Juice and Tea Filling Line15,000 BPH Juice and Tea Filling Line5,000 BPH Carbonated Drink Filling Line12,000 BPH Carbonated Drink Filling Line18,000 BPH Carbonated Drink Filling Line6,000 Cans Per Hour Beverage Line
Container, closure and packing decisions
250 ml to 500 ml PET Water Bottle Line1 L to 2 L PET Water Bottle Line19 L and 20 L Water Bottle Washing and Filling LineCrown Cap Glass Bottle Filling LineROPP Cap Glass Bottle Filling LineAluminum Can vs PET Bottle Beverage LineShrink Wrap vs Carton Packing for Beverage LinesSleeve Label vs OPP Labeling MachineBeverage Bottle and Closure Compatibility GuideMulti-Format Bottle Change Parts Planning
Process and line equipment modules
RO Water Treatment System for a Beverage PlantOzone and UV Water Disinfection SystemBeverage Sugar Dissolving SystemBeverage Mixing and Blending TanksBeverage Homogenizer Selection GuideHTST and UHT Beverage Processing SystemBeverage Deaeration SystemBeverage Carbonator and Mixer SystemAutomatic Bottle Rinsing MachineBottle Cap Elevator and SorterPET Bottle Air Conveyor SystemBeverage Bottle Warmer SystemBeverage Coding and Inspection SystemRobotic Palletizer for Beverage LinesBeverage Bottle and Can Depalletizer
Quotation, acceptance and lifecycle decisions
Beverage Line Battery Limits and Scope GuideBeverage Line FAT vs SAT GuideBeverage Factory Utilities Sizing ChecklistFirst-Year Beverage Line Spare Parts PackageBeverage Line Site Readiness ChecklistBeverage Container Sample Trial GuideBeverage Machinery Electrical Standards and Export DocumentsBeverage Line Total Cost of Ownership GuideNew vs Used Beverage Filling LineLinear vs Rotary Beverage Filling MachineMonoblock vs Separate Beverage Filling Machines
Utilities, hygienic design, inspection and end-of-line integration
Use these pages to define process boundaries, factory inputs, risk controls and acceptance evidence before comparing beverage machinery quotations.
Define the complete beverage factory before purchase
Use these project, process, utility, inspection, packaging and data guides to prepare a comparable RFQ and acceptance plan.
Close the decisions that sit between machine selection and a working beverage factory
Use these guides to define quality, hygienic validation, utilities, packaging, controls, installation and performance evidence before procurement.