Review di equipment scope for your project

Plan beverage factory space and utility scope before you compare price

Machine list alone no show whether one beverage line fits your building or whether site supply go support am. Start with di drink, bottle and cap, accepted final packs and shift plan. Put di measured building drawing beside di equipment and utility schedule. This guide helps you identify interfaces, missing evidence and who go close each question before final quotation.

Temporary supply and final handover

Check air use when line stop

Check wetin split shipment go change

Build one layout basis wey every supplier go use

Mark actual measurements and assumptions differently. Include water treatment, preparation, bottle supply, filling and final packing where your project needs them. Draw equipment work space and routes together, with revision and date. If you keep old machines, survey their connection points too. A drawing wey only shows machine rectangles no settle daily work, access or expansion.

Layout questionEvidence to gatherDecision to review
Measured buildingColumns, height, level changes, doors, overhead obstacles and existing service points.Which dimensions are confirmed, which remain open, and who go measure them?
Material and people routesIngredient, bottle, cap, finished-pack, waste and staff paths.Where replenishment or movement crosses another route, and which arrangement needs site review?
Delivery and maintenanceLargest shipping module, unloading route, guard opening and assembly-removal space.Can equipment enter, get service and leave later? Name who reviews handling and building constraints.
Phased expansionFirst-phase equipment, reserved areas, later pipes and temporary work routes.Does di next phase block current production or future access? Keep each phase on di same drawing basis.

Compare CSD utility quotations with di same boundary

For carbonated drink projects, a utility number needs product, pack, operating mode and measuring point. Two values with di same unit fit mean different things. Ask for di missing conditions before you compare supplier offers.

Quote itemComparable evidenceWho supplies and verifies
Cooling and powerKeep heat-removal duty separate from chiller electrical input. Both fit use kW. State supply/return, flow, product and ambient conditions.Name chiller, pumps, pipes and controls inside di offer, plus di cooling measuring point.
Dissolved CO₂ and gas supplyProduct carbonation target no be total supplied gas. Declare whether purge, startup, stops and rejects enter di measured window.Name gas-supply, pipe, meter and machine-interface owners; relate consumption to accepted final packs.
PET blowing and service airIf bottle blowing enters scope, list its air separately from service air. State inlet flow, pressure, quality and reference conditions.Separate included compressor, treatment, storage and distribution from buyer work.
Average and peak demandShow operating modes and which users actually run together. Identify di basis and window for average and peak.Check whether auxiliary power already enters di total, so one load no gets counted twice.
Connection and handoverMark inlet, supply/return and measurement references on di current drawing.Name who supplies, installs, measures and accepts chiller, pumps, pipes and gas connections, with due dates.

Keep these clarifications inside one quotation comparison sheet. Give missing data one owner and due date. Equipment supplier and site team need review di actual interface before configuration gets final.

Line don stop, but compressor still dey load. Where di air dey go?

Before you ask price for bigger compressor, find one quiet period when filling and packing don finish. Air wey still dey pass fit go another line, dryer purge or leak. Compressor motor wey still dey turn no tell you how much air anybody use.

Match di meter to wetin still dey work

Write down where dem put di air meter and which branches e cover. Take di start and end reading for one quiet period and note how long di period last. Ask di shift people whether cleaning, instrument air or dryer purge still dey use air. If di meter serve two lines, no charge all di reading to di line wey stop.

Ask for two figures before you compare price

Let di supplier show di idle flow and di flow when good packs dey come out, both for di same meter. If dem find and repair leaks, repeat di quiet-period check with di same equipment on. Use di demand wey production still get to review compressor size. For leak-repair work, agree beforehand how una go measure di change.

If supplier split the machine so e fit enter, wetin the new price cover?

One supplier fit quote the complete machine, another one fit quote am in different sections because of your factory door. The cheaper figure no tell you whether the two suppliers go hand over the same working line.

List wetin go arrive for each crate

Ask for each crate number and outside size. Make supplier mark which joint dem go open for factory and which connection site team must complete. Get one drawing wey show the same numbers from unloading point reach installation spot.

Put the extra site work for the quote

Ask who go supply connection parts, who go join the sections and which checks go show say the reassembled machine match the agreed condition. If supplier need come back for that work, put travel, labour and time on separate lines.

Compare the two prices after you don add the work each quotation leave for your team. Keep the crate drawing with the order so everybody fit trace wetin the price cover.

Turn missing interface data into a reviewable work list

Collect equipment schedules, drawing revisions, utility measurements and photos of identified connection points. Record where, when and under which mode each reading comes from. Agree who provides trial materials and who checks supply at di machine inlet. Keep untested site work, required evidence and acceptance responsibility visible. If layout, pack or equipment changes, review affected interfaces before you reuse di earlier plan.

Email di project team about layout and utilities

Dem test filler with temporary water line. Who go prove di permanent supply?

If site pipe never ready, contractor fit arrange another water source for one agreed machine test. Di result fit still help buyer, but e matter which supply dem use. Problem go start if final report show permanent connection as if dem don test am.

Write wetin dem actually use

For di trial sheet put di water source, connection point, date and which machine function dem test. Mark di temporary route on drawing and attach one photo wey show di point. Note any test wey depend on water quality or delivery conditions wey dem never confirm for di permanent line.

Give di outstanding test an owner

Ask plant contractor to name di person wey go hand over di final connection. Make equipment supplier list which checks need repeat there, plus who go witness and sign di result. If di permanent supply ready later, use its own record and drawing revision.

For final handover, keep both records together. Anybody wey read am go see wetin machine trial prove and wetin dem later confirm for di actual installation.

Questions about layout and supply

Cooling duty and electrical input both show kW. Same thing?

No. One describes heat removal and di other electricity use. Ask for labels, conditions and included equipment before comparing offers.

Dissolved CO₂ target enough to estimate total gas use?

Request measured total supply with a stated point and window. Write whether purge, startup, stops and rejects enter that figure.

Bottle-per-hour rating enough to decide factory layout?

You also need product, pack, shifts, material routes, equipment access and actual site measurements. Nominal speed alone no fixes di space or service demand.

China Beverage Machinery na di beverage equipment website of Allot Tech (Suzhou) Co., Ltd. Di company supports machinery sourcing, line planning and export project coordination from China.

Allot Tech (Suzhou) Co., Ltd.

Email di project team
Direct project contact US +1 818 262 0958 China +86 186 6213 1120 WhatsApp +86 186 6213 1120