Choose carbonated drink line with the drink, pack and test result in mind
Write down the soft drink wey you wan produce, the target carbonation and how dem go store am. Sparkling water and a mixed soft drink fit need different preparation. Ask the supplier to name the recipe and package behind the quoted speed. If you dey add cans to a bottle plant, check the seamer, transfer and inspection scope before using the old rate.
Check how the new cap dey face
Glass and PET for one sales order
Trace sample bottles back to the carton

Choose the container before you price the machine
Send real drawings and samples for the body, neck or can end. Make the price list show wetin the supplier includes, wetin you provide and where another party joins the line.
| Part to check | Record to ask for |
|---|---|
| PET | Confirm the bottle and cap for the intended application, plus bottle supply, filling, capping and handling. |
| Glass | Specify new or returnable bottle, the preparation method, closure and transfer work. |
| Can | Confirm body and end combination, seamer scope and how seam and rejects go get checked. |
Find which stage the CO₂ drop start
Link the samples to one run and one package revision. Agree the method, unit and product temperature first so the readings fit compare.
| Part to check | Record to ask for |
|---|---|
| Filler inlet | Write dissolved CO₂, temperature and measurement point. If e already low, check mixing, carbonation and supply. |
| Fresh sealed pack | Mark time, speed and filling or closing position if you fit trace am. Keep the delay from closure to measurement. |
| Retained pack | Measure separate unopened packs after the agreed storage. Match bottle, cap or can-end lot and seal evidence. |
| Final acceptance | Agree sampling frequency, criteria and responsibilities. Count accepted final packs, rejects and stops for that drink. |
Repeat the comparison before you blame one machine. Bottle closure and can seam each need inspection suited to the pack.
Agree how the line go pass the trial
Use the actual drink and production pack for the agreed run. Ask for the raw values, pack IDs and the list of rejected packs. Check low fill and CO₂ as separate results. If the quote covers only the filler, name who supplies carbonator, capper or seamer, conveyor, inspection and packing. Ask which trial must still happen for your plant.
Send carbonated line details to project team sales@allottech.comIf quality team carry two soft drink bottles for test, how store go know which carton short?
During trial for soft drink line, quality team fit open one carton for test while warehouse still see full carton for the list. If nobody link the sample slip to that carton, the count go differ even when the bottle code dey clear.
Write the code before sample leave
Use one actual carton and copy the batch code from the bottles wey dem select. Write the carton mark, pallet number if e get one, how many bottles dem take and who receive the sample. If the carton no get unique number, use the trace detail wey the plant fit really confirm.
Check wetin happen to the open carton
Ask whether dem hold am, complete am with bottles wey plant policy allow, or record am as incomplete. Follow that decision reach the warehouse record. No count the two sample bottles as goods ready for sale if dem don open dem for test.
Keep the sample slip and the final carton record together. Make another person use both papers trace the same bottle batch before una sign acceptance.
One quote get glass bottle and PET bottle. Wetin dem go change between di two?
If depot wan buy soft drink for returnable glass and for PET, no stop for “500 ml bottle” on di order. Di two fit hold di same amount but need different way to receive empty bottle, close am and pack am for dispatch.
List wetin each order need from start reach finish
For di glass order, put di bottle drawing, di actual crown cap if na dat one dem use, and di crate code. For PET, put di neck drawing, screw cap and di pack wey di shop go receive. Ask supplier to mark which machine both use, which part dem go change and which extra machine di price cover.
Check di promise with two complete samples
For trial, follow one order from empty bottle reach full crate, then follow di other one reach di agreed pack. Write down wetin dem remove or fit, who supply di change parts, and which test still dey wait. Clip wey show one glass bottle fill no settle di PET side.
Put any future bottle for separate option with di price and trial wey e go need. Dat way buyer fit see wetin di first payment really cover.
The new cap fit the bottle, but e go face the right way for the feeder?
Cap wey person fit screw onto one bottle by hand fit still give wahala when feeder dey send plenty caps go the capper. If you wan change supplier, ask for caps from the actual production lot. Carry small sample of the old cap too, make the machine supplier fit compare both.
Check the shape wey the feeder dey use
Put the two cap drawings side by side. Ask the machine supplier which part the feeder dey use to tell top from bottom. Show the cap height, outside shape and the band for the bottom. If any guide or format part go change, make dem name am for the quote.
Count wetin reach the capper
For the agreed trial, keep old and new caps separate. Write down how many new caps reach the handover point facing the wrong way, where dem stop and which lot dem come from. If dem face well, record that result too. Whether the cap go seal the drink well still need its own check.
Keep one marked cap and the trial record with the purchase order. This way, when the next delivery land, the receiving team know the exact cap wey pass the feeder trial.
Questions
I fit use one opened bottle for tomorrow test?
Use another unopened pack from the same run. Opening changes the sample.
Low CO₂ after storage mean the capper spoil?
Compare storage, method and fresh readings first. Match pack lots and closure checks if e repeat.
The PET line fit run cans if speed match?
Ask for proven machine and container compatibility, can-end closing and inspection scope. Same speed alone no answer am.
More technical guides in English
Cooling, gas and air need one clear quote boundary
Check building routes and compare utility scope before you settle di carbonated line offer. Separate cooling duty, power and total gas supply.
Open di factory layout and utilities guide