Plan di right machine line for your drink business
No start with machine price alone. First settle wetin you wan fill, di bottle or can, di good packs wey you need and wetin your site fit supply. China Beverage Machinery dey help buyers arrange equipment scope and compare quotation for new lines or upgrades. Di right plan must connect product preparation, filling, closing and packing.

Which problem you wan solve?
You wan start new factory
Write your drink and package list first. Check treatment, container supply, filling, closing, inspection and packing as one project. Make person responsible for each connection; no assume say every item enter di machine price.
You wan change one machine
Record di old equipment, conveyor height, available space, signals and utilities. A faster filler no go increase packed output if di old packer no fit follow. Compare both sides with di same bottle and pack pattern.
Your line dey lose output
Record where di first stop or reject happen, di product, package and time. Separate lack of bottles, product shortage, filling loss and packing delay before you choose replacement equipment.
Match di equipment to di drink
| Your product | Scope to review | Information wey changes di choice |
|---|---|---|
| Bottled water | Water treatment, bottle supply, filling and closing | Water analysis, bottle size and neck, closure and good bottles per shift. |
| Juice or tea | Product preparation, treatment, filling and cooling where required | Particles, viscosity, intended storage, filling conditions and package heat tolerance. |
| Fizzy drink | Mixing, chilling, carbonation, pressure filling and closing | Product temperature, gas conditions and bottle or can pressure suitability. |
| Existing factory upgrade | Retained machines, transfers, controls and commissioning | Current accepted output, stop records, layout and who supplies each interface. |
Prepare one brief wey suppliers fit compare
Send di drink, container material and volume, closure, target good output, shift hours, final pack, destination and purchase timing. Add site drawing, utility information and sample details when dem ready. Mark wetin you never confirm. Ask di quotation to separate machines, change parts, site work, installation and acceptance tests. State where dem go count good output and which rejects or stops enter di test record.
Questions
Machine speed na di same as finished output?
No. Nameplate speed no include every stop, reject or packing limit. Compare accepted packed bottles over di agreed time, with di same product and package.
One filler fit handle water, juice and fizzy drink?
No assume so. Gas, particles, temperature, cleaning and package conditions fit need different process and equipment. Ask for evidence for each product and format.
You fit give exact price without product details?
A useful quotation needs scope. Confirm product, package, output and site first, then ask wetin enter di offer and wetin you must provide separately.
Discuss your project scope
Send di confirmed information and your main question. Di first review fit identify missing inputs and di next trial or drawing wey you need; e no be automatic performance approval.
Email di project team sales@allottech.comMore technical guides in English
Continue your water project planning
Choose water bottling equipment by bottle supply, good packed output and real water demand. Check RO flow boundary, tank, pump and complete quotation scope.
Open di water bottling line guidePlan juice and tea production
Plan juice and tea line with real recipe, pulp and bottle-cap samples. Check process, equipment scope, cleaning change and trial responsibility before price.
Check recipe, pulp and bottle before juice-line quotationPlan soft drink filling and packing
Plan soft drink filling line for PET, glass or can. Trace CO₂ from filler inlet to sealed sample and agree how to count accepted packs.
Check CO₂, bottle or can and line acceptance