Gastos ng Beverage Line at RFQ Guide

Filipino / Gastos ng Beverage Line at RFQ Guide

Pagplano ng beverage line at suporta sa export

Gastos ng Beverage Line at RFQ Guide

Ang hindi pa kumpirmadong detalye ay dapat manatiling malinaw na assumption o option, hindi walang-basehang garantiya.

Filipino

Impormasyon para sa mas tumpak na technical proposal

Dapat malinaw ang included equipment, options, buyer supply, utility limits, controls, installation, FAT at acceptance.

Bottled water line

Water analysis, treatment, PET blowing, rinsing-filling-capping, labeling at shrink packing.

Juice at tea line

Ingredient preparation, mixing, filtration, heat process, hot fill, cooling at CIP.

Carbonated drink line

Syrup room, chilling, carbonation at pressure filling para sa PET, glass o can.

Glass, cans at 5 gallon

Returnable washing, closure, can seaming, inspection, crates at secondary packing.

RFQ / Layout / FAT

Pantayin ang project scope bago ikumpara ang presyo

Dapat malinaw ang included equipment, options, buyer supply, utility limits, controls, installation, FAT at acceptance.

01

Produkto at package

Ipadala ang beverage family, properties, filling temperature, drawings ng bottle/can/cap, label at final pack.

02

Capacity at schedule

Ibigay ang saleable output bawat SKU, shift, batch, changeover at expansion plan.

03

Pabrika at utilities

Ibahagi ang layout, height, drains, tubig, kuryente, hangin, steam, cooling at CO2.

04

Testing at handover

Pagkasunduan ang test materials, duration, good output, rejects, checks, spares, documents at training.

Technical RFQ

Impormasyon para sa mas tumpak na technical proposal

Ang hindi pa kumpirmadong detalye ay dapat manatiling malinaw na assumption o option, hindi walang-basehang garantiya.

  • Inumin at validated process
  • Drawings ng bottle, can, cap, label at pack
  • Saleable capacity bawat format
  • Batch, shift at changeover plan
  • Raw-water report at target quality
  • Factory layout at utilities
  • Bansa, voltage, document language at shipping
  • Budget, purchase timing at acceptance
FAQ

Karaniwang tanong ng buyers

Paano ihahambing ang suppliers?

Gamitin ang iisang RFQ at ikumpara ang included, excluded, options, responsibilities, FAT, installation at documents.

Final na ba ang configuration sa website?

Hindi. Ang final line ay nakabatay sa confirmed product, package, capacity, site at regulatory requirements.

Gawing executable RFQ ang unang project idea

Ipadala ang produkto, package, capacity, factory, destination, budget at schedule para maayos ang line scope.

WhatsApp Email Call US RFQ